Mein Schiff 2

Mein Schiff 2

Mein Schiff 2 was constructed by MEYER TURKU and delivered to TUI Cruises in January 2019. It’s the sixth new cruise ship in the TUI Cruises fleet – the entire series was built in the Finnish city of Turku.

The new series features around 180 additional staterooms, increasing the total number of passengers to 2,894 – and 90% of them can enjoy the luxury of an outside cabin with a sea view.

There are even more changes to note: The 438-metre running track on Mein Schiff 1 and Mein Schiff 2 is significantly longer than on the previous ships, and the gym and spa areas are also bigger. The arena with the sports court and climbing wall has also been fully covered for the first time. It’s plain to see the ocean liners in the Mein Schiff fleet are true sport and wellness ships.

Another new feature is the “Schaubühne”, an auditorium for speeches and concerts. Passengers can now choose from a wider selection of suite categories, presenting more diversity in the choice of cabins.

At the same time, however, some tried and tested elements have been kept, such as the 25-metre outdoor pool and the “Diamant Bar” behind the diamond-shaped glass façade at the stern of the ship.

The new fleet is setting environmental standards with its cutting-edge technology. All engines are fitted with catalytic converters, and a desulphurisation system is used to reduce nitrogen oxide emissions.

Tonnage
111,554 GT
Length
317,2 m
Breadth moulded
35.8 m
Decks
16
Total engine power
48,000 kW
Propulsion power
28 MW
Speed
22 kn
Passengers
2,894
Passenger cabins
1,447
Crew
1,000
Classification
DNVGL
Shipyard
MEYER TURKU
Cruise Line
TUI Cruises

Our ships